01Water Distribution
Water mains from 4" service lines to 20" C900 transmission, installed by open cut with fittings, valves, hydrants, tie-ins and disinfection.
PVC & HDPE mains · Services · Hydrants · Tie-ins

Edge Utilities is your go-to contractor for underground infrastructure across Mississippi — self-performed by our own crews, excavators and drill rigs.
Founded in 2024 and based in Hattiesburg, Edge Utilities is a utility contractor built around field experience. Our owners have spent the last two decades managing heavy civil and utility construction before Edge was created, and that experience carries into how every job is bid, staffed and closed out.
We take on municipal water and sewer improvements, force main tie-ins, drainage and directional bore packages — working directly for cities, engineers and general contractors.
With over 20 years of Utilities and Construction Engineering in the Southeast, Edge is equipped to handle your project needs.
01Water mains from 4" service lines to 20" C900 transmission, installed by open cut with fittings, valves, hydrants, tie-ins and disinfection.
PVC & HDPE mains · Services · Hydrants · Tie-ins
02Gravity sewer, manholes, lift stations and large-diameter force main, including line stops and bypass work to tie in without taking a system down.
Gravity sewer · Lift stations · Line stops · Bypass
03HDPE directional drilling under roads, rail, creeks and developed property where open cut isn't an option. Cased or uncased, tracked and tested.
HDPE · Road & creek crossings · Casing
04Storm drainage, culverts, inlets and the excavation, backfill and restoration that keeps a utility project moving from clearing through final grade.
Storm pipe · Culverts · Excavation · Restoration
We review plans, quantities and site conditions, then price the work with the schedule and access restrictions in mind.
Plan review · Quantities · Schedule
Our own crews put the pipe in the ground. Depth, bedding, compaction and testing are handled to the spec, not around it.
Self-perform crews · Testing · Inspection
Pressure tests, disinfection, as-builts and restoration. Edge digs deep to satisfy owners and engineers on contract compliance.
As-builts · Restoration · Acceptance
4" and 6" waterline installed and placed in service, with two follow-on programs totaling roughly 60,000 feet of 8", 6" and 4" main.
Quad 24" line stops with double bypass to tie a new 30" force main into an existing 24" system while flow stayed in service.
10,000 feet of HDPE pipe directionally bored where crossings and developed corridors ruled out open-cut installation.
Send the location, scope and schedule — or the full bid package — and we'll get you a number. We work for municipalities, engineers, developers and general contractors across Mississippi.